Refresh a Room: Materials Checklist

A standard room refresh is paint plus new flooring. Do the paint first so you do not drip on a new floor.

  1. Paint walls and ceiling

    Two coats of finish; primer if the colors differ a lot.

    Open the paint calculator

  2. Install new flooring

    Order 7-10% extra and let it acclimate 48 hours.

    Open the flooring calculator

← All calculators