Insulation Calculator

The R-value to aim for in your climate zone, how much to add over what is already there, and the bags of blown-in, packs of batts or sheets of foam board to buy for an attic, wall, floor or basement wall. It also counts the vent baffles, depth rulers and air-sealing supplies, and draws the insulation depth against the target.

Blowing loose-fill cellulose into an atticLooking down the length of an unfinished attic toward the gable vent. The ceiling joists still hold a thin, yellowed layer of old fiberglass. Foam vent baffles line every rafter bay at the eaves so the soffit air can reach the ridge. A blowing hose works from the far end back toward the hatch, filling one bay at a time with grey cellulose until it reaches the orange target line on the depth rulers stapled to the joists, burying the joists completely. The two nearest bays still show the old insulation for comparison.

Prefer your local store? Enter its prices for a cost estimate.

Attic insulation reference

0R-30R-4914″ASPHALT SHINGLES ON 7/16″ DECKVENT BAFFLE, 1–2″ AIR SPACE TO DECKAIR PATH: SOFFIT TO RIDGE VENTSOFFIT VENTWALL BATTSTHIN OVER THE PLATEAIR-SEAL TOP PLATES FIRSTDEPTH RULER, 1 PER 300 FT²½″ DRYWALL CEILINGCOVER THE JOIST TOPSCELLULOSE, R-3.5/IN SETTLED
Typical eave section with blown cellulose to about R-49, not to scale. R-value per inch and bags per 1,000 sq ft vary by product: blow to the thickness on the bag chart.

Attic floor, DOE

Zone 1
R-30 to R-49
Zones 2–3
R-30 to R-60
Zone 4
R-38 to R-60
Zones 5–8
R-49 to R-60
Adding to 3–4″, zones 2–3
R-25 to R-38
Adding to 3–4″, zones 5–8
R-38 to R-49
IECC 2021, new homes
R-30 / 49 / 60

Walls, floors, basements

2x4 wall cavity
R-13 to R-15
2x6 wall cavity
R-19 to R-21
Floor, zones 1–2
R-13
Floor, zone 3
R-19 to R-25
Floor, zones 4–8
R-25 to R-30
Basement wall, zone 4
R-10 foam or R-13
Basement wall, zones 5–8
R-15 foam or R-19

R-value per inch

Blown cellulose
R-3.5 to 3.8, settled
Blown fiberglass
R-2.2 to 2.9
Fiberglass batts
R-2.9 to 4.3
Mineral wool batts
R-4.0 to 4.3
EPS foam
R-3.6 to 4.2
XPS foam
R-5
Polyiso, foil-faced
R-5.6 to 6.5

Venting and details

Attic vent area
1 ft² per 150 ft²
Vents split high and low
1 ft² per 300 ft²
Air space under baffle
1 in minimum
Depth rulers
1 per 300 ft²
Non-IC recessed lights
3 in clear
Cellulose settling
about 10–20%
Attic hatch
weatherstrip, foam lid

Safety Attics get dangerously hot: work in the morning, drink water and take breaks. Step only on joists or a board laid across them; a foot between the joists goes through the ceiling. Wear a P100 or N95 respirator, goggles and long sleeves. Keep insulation clear of non-IC recessed lights, flues and chimneys, do not bury live knob-and-tube wiring, and leave grey-brown pebbly vermiculite alone until it has been tested for asbestos.

Full notes
  • Air seal before you insulate. Foam the holes around pipes, wires and flues, caulk the top plates to the drywall and weatherstrip the attic hatch: loose fill does not stop air, and air leaks carry more heat and moisture than the insulation can make up for.
  • Put a vent baffle in every rafter bay that has a soffit vent, from the top plate up past the final insulation depth, so the blown fill cannot block the air path from the soffit to the ridge.
  • Blown cellulose settles about 10–20% in its first year. Blow to the installed thickness on the bag chart, not the settled one, and staple a depth ruler about every 300 sq ft facing the hatch so you can see the level.
  • Never compress batts: an R-19 batt squeezed into a 2x4 wall is worth about R-13. Cut them to the length of the cavity, split them around wires and pipes rather than stuffing them behind, and use unfaced batts when you add a layer over old insulation.
  • Keep insulation 3 in away from recessed lights that are not IC-rated, and build a metal or noncombustible dam around chimneys and flues to the clearance on the flue label. Do not bury live knob-and-tube wiring.
  • If the old attic fill is grey-brown and pebbly, it may be vermiculite that contains asbestos. Do not disturb it: have it tested or call a professional before you work in the attic.

Planning a bigger project?