Concrete Calculator
How many cubic yards of concrete, or how many 40, 60 and 80 lb bags, you need for a slab, patio, walkway, footing pad or round pier.
Pour reference
Mix and pour
- Water
- 3 qt / 80 lb bag
- Mix time
- 3–5 min / batch
- Working time
- 60–90 min
- Air temperature
- 50–90 °F
- Frost
- none for 48 h
Slab
- Walks and patios
- 4 in
- Driveways
- 5–6 in
- Gravel base
- 4 in, compacted
- Joint spacing
- 2–3× thickness, in ft
- Joint depth
- ¼ of slab
Cure
- Keep moist
- 7 days
- Foot traffic
- 24–48 h
- Vehicles
- 7 days
- Design strength
- 28 days
Ordering
- 80 lb bag
- 0.6 ft³
- 1 yd³
- 45 × 80 lb bags
- Weight
- ≈ 4,000 lb / yd³
- Ready-mix
- above 1.5 yd³
Safety Wet concrete is caustic. Wear gloves, eye protection and boots; rinse skin contact right away.
Full notes
- Order 5-10% extra. Subgrade is never perfectly level and forms flex under the weight.
- Walkways and patios are usually 4 inches thick; driveways and garage slabs are 5-6 inches.
- Bagged mix is fine for small jobs. Once you need more than about 1.5 cubic yards, ready-mix delivery is usually cheaper and much less work. Most plants have a minimum load, often 1-3 cubic yards, and charge a short-load fee below it.
- An 80 lb bag yields about 0.6 cubic feet, a 60 lb bag about 0.45, a 40 lb bag about 0.3.
- Concrete weighs roughly 4,000 lb per cubic yard, so check that your trailer or truck can carry the load.
- Weather: pour when it is roughly 50-90 °F. Do not pour if frost is expected in the next 24-48 hours; in hot or windy weather mix smaller batches and keep the surface damp.
- Water: about 3 quarts per 80 lb bag (check your bag). Too much water makes concrete easier to pour but weaker and more prone to cracking. Aim for an oatmeal-like mix that holds its shape.
- Mixing order in a drum mixer: about two-thirds of the water, then the dry mix, then the rest of the water a little at a time. Mix 3-5 minutes per batch.
- Working time is about 60-90 minutes after mixing, less in heat. Never add water to a batch that is stiffening.
- Finishing: screed level, bull-float, wait for the surface water to disappear, then edge, cut control joints (about a quarter of the slab depth) and broom or trowel.
- Curing: keep the slab damp or covered for at least 7 days. Light foot traffic after 24-48 hours, cars after about 7 days, full strength at about 28 days.
- Safety: wet concrete is caustic and can burn skin. Wear gloves, eye protection and boots, and rinse any skin contact quickly.