Fence Calculator
Posts, rails, pickets or panels, concrete bags and gate hardware for a wood, vinyl or chain-link fence. Enter the length, height, corners and gates, and get a shopping list with stain and labour estimates.
Fence reference
Posts
- Spacing
- 6–8 ft on center
- Line, corner, end
- 4×4 (6×6 at 8 ft tall)
- Gate posts
- 6×6, hole 2 in wider
- In the ground
- ⅓ of post length
- Hole diameter
- 3× post width
- Hole bottom
- below frost depth
Rails and pickets
- Rails, 4 ft fence
- 2 per bay
- Rails, 5–8 ft fence
- 3 per bay
- Rail stock
- 2×4, joints on posts
- Pickets above grade
- about 2 in
- Picket fasteners
- 2 per rail
- Rail to post
- 2–3 screws per end
Concrete and gravel
- 50 lb fast-setting
- ≈ 0.375 ft³
- 60 lb / 80 lb mix
- 0.45 / 0.60 ft³
- Fast-setting
- sets in 20–40 min
- Rails and pickets on
- after about 4 h
- Gravel under post
- 4–6 in
- Collar top
- crowned above grade
Finish and paperwork
- Lumber
- ground-contact rated
- Nails and screws
- hot-dip galv. or stainless
- Stain coverage
- ≈ 150–200 ft²/gal
- Stain treated wood
- once it is dry
- Call 811
- a few days before digging
- Height limits
- check code, HOA
Before you dig Call 811 a few working days ahead so buried lines are marked. Confirm the property line (survey pins or a plat), and check permit, height and HOA rules before you buy materials. Concrete is caustic: wear gloves and eye protection.
Full notes
- Count corners, ends and gate posts separately: they take the load of the fence and the gate, so they get bigger holes and, for gates, 6×6 posts.
- Rule of thumb for post depth: about one third of the post length in the ground (2 ft for a 4 ft fence, 3 ft for 6 ft), and always below your local frost depth.
- Set the end and corner posts first, run a string line between them, and set the line posts to the string so the fence is straight and the posts are in plane.
- Pour fast-setting concrete dry into the hole around a braced, plumb post, then add about a gallon of water per 50 lb bag. Crown the top above grade so water runs away from the post.
- Put 4–6 inches of gravel in the bottom of each hole so the end grain of the post can drain instead of sitting in a cup of water.
- Let pressure-treated lumber dry before staining (water should soak in, not bead). Use hot-dip galvanized or stainless fasteners: treated wood corrodes plain steel.
Planning a bigger project?
Concrete CalculatorHow many cubic yards of concrete, or how many 40, 60 and 80 lb bags, you need for a slab, patio, walkway, footing pad or round pier.Gravel CalculatorCubic yards and tons of gravel for a driveway, path, drainage trench or patio base.Paint CalculatorHow many gallons of paint and primer a room needs from its size, ceiling height, doors, windows and coats, rounded to what you actually buy.