Deck Calculator
Deck boards, joists, ledger, beams, posts, footings, hardware, railing and stairs for a rectangular attached or freestanding deck, with a joist-span check. Change any input and the framing plan redraws.
Deck framing reference
Joist span, southern pine No. 2
- Spacing
- 12″ · 16″ · 24″ o.c.
- 2x6
- 9′11″ · 9′0″ · 7′7″
- 2x8
- 13′1″ · 11′10″ · 9′8″
- 2x10
- 16′2″ · 14′0″ · 11′5″
- 2x12
- 18′0″ · 16′6″ · 13′6″
- Overhang past beam
- ≤ ¼ of the span
Ledger and beam
- Ledger fasteners
- ½″ lags or through-bolts
- Pattern
- 2 rows, staggered
- Fastened into
- house rim joist
- Never onto
- brick veneer, siding
- Flashing
- tape + Z-flashing
- Beam splices
- over a post
- Joist to beam
- hurricane tie each
Posts and footings
- Posts
- 6x6, ground contact
- Footing bottom
- below frost line
- Footing min.
- 12″ dia., 6″ thick
- Soil, untested
- 1,500 psf
- Design load
- 40 live + 10 dead psf
- Post base
- standoff, 1″ above pier
- 80 lb bag
- 0.6 ft³
Decking, guards, stairs
- Composite joists
- 16″ o.c., 12″ diagonal
- 5/4 wood
- 16″ o.c.
- 2x6 wood
- 24″ o.c.
- Guard required
- > 30″ above grade
- Guard height
- 36″ min.
- Openings
- < 4″ sphere
- Riser · tread
- ≤ 7¾″ · ≥ 10″
- Handrail
- 4 or more risers
Safety Call 811 before you dig. Most deck collapses start at the ledger: bolt it to the house rim joist, flash it, and never hang it on brick veneer or siding. Wear eye protection with the circular saw and impact driver.
Full notes
- Joist span is measured from the face of the ledger to the beam, not to the outer rim. The overhang past the beam should be no more than a quarter of that span.
- Never fasten a ledger to brick veneer, stucco over foam, a cantilevered floor or through siding. Remove the siding, flash the rim board and bolt into the house rim joist, or build a freestanding deck.
- Footing size depends on the load and the soil: the calculator assumes 50 psf (40 live + 10 dead) and 1,500 psf soil, which is the IRC default when the soil is not tested.
- Use ground-contact pressure-treated lumber for posts and any framing near the soil, and hot-dip galvanized or stainless fasteners and connectors rated for treated wood.
- Composite decking usually needs joists at 16 in o.c. or closer (12 in for diagonal boards and stair treads). Read the gap and fastener rules for the exact product.
- Most US towns require a permit for a deck that is attached to the house, higher than 30 in or larger than 200 sq ft. Call 811 before you dig the footings.
Planning a bigger project?
Concrete CalculatorHow many cubic yards of concrete, or how many 40, 60 and 80 lb bags, you need for a slab, patio, walkway, footing pad or round pier.Gravel CalculatorCubic yards and tons of gravel for a driveway, path, drainage trench or patio base.Paint CalculatorHow many gallons of paint and primer a room needs from its size, ceiling height, doors, windows and coats, rounded to what you actually buy.